Quarter Planning
Bets, capacity and trade-offs on one board. Ends with a ranked list and the things you said no to.
- Duration
- 90 min
- Group size
- 5 to 12
- Difficulty
- Advanced
- Plan
- Team
Facilitation guide
The session, step by step.
Two weeks before a quarter starts, with the people who will do the work. It replaces the spreadsheet nobody reads with a ranked list and a visible line.
- 1
10:005 min
Last quarter in five minutes
Bring everyone here- You say
- “Three numbers and one surprise. That is all the history we need.”
- The room does
- The lead walks through the review frame. Everyone adds one note: what surprised them.
- 2
10:0515 min
Bets on the table
Private writing- You say
- “A bet is one sentence: we believe this will get us that. Write as many as you have.”
- The room does
- People write bets in private, so the senior voices do not set the list.
- 3
10:2015 min
Size them
Sticky notes- You say
- “Small, medium or large. If you need a spreadsheet to size it, it is a large.”
- The room does
- Owners tag each bet with a size. The group challenges any that look optimistic.
- 4
10:3510 min
Capacity check
Timer- You say
- “Here is how many people-weeks we really have, after holidays and support.”
- The room does
- The team fills the capacity frame and counts how many large bets fit. It is fewer than hoped.
- 5
10:4510 min
Vote
Voting dots- You say
- “Eight dots each, and you may stack them.”
- The room does
- Everyone votes with results hidden. The board then sorts the bets by score.
- 6
10:5520 min
Draw the line
Bring everyone here- You say
- “Everything above this line we do. Everything below it we say no to, out loud.”
- The room does
- The group drags the cut line into place and moves the rest to Not this quarter.
- 7
11:1515 min
Owners and first steps
Export- You say
- “Every bet above the line needs a name and a first step that happens this week.”
- The room does
- Owners add their name and a first step. The list goes to the tracker as one export.
The board
Laid out before anyone joins.
Three lanes, top to bottom: Bets, This quarter and Not this quarter. The frames, the prompts and the timer presets are already in place, so the first minute goes to the question and not to drawing boxes.
Preview, not to scaleBets
This quarter
Not this quarter
Related templates
Run these next.
- Planning
Pre-mortem
Pretend the project already failed and write down why. Cheaper than finding out in six months.
45 min4 to 12 people5 steps
- Planning
Effort and Impact Matrix
Every candidate on one grid. The quick wins end up in a corner where nobody can ignore them.
30 min3 to 10 people4 steps
- Planning
Weekly Planning
What shipped, what must happen by Friday and who is waiting on whom. Three commitments each, at most.
30 min3 to 9 people4 steps
Your room, this agenda.
Open Quarter Planning on a fresh board, share the link and start the timer. It comes with Team and Workshop Pro, and both start with a 14-day trial.
90 min · 5 to 12 people · 7 steps